Public Portal Main Logo
1001 E 9th Street, Reno NV 89512
  
Contract Insight - Contract Management System
Public Website Search
Contract Title: Consultation Services
Contractor: Wood Rodgers, Inc
Department: County Managers Office
Contract Start Date: 1/1/0001
Contract End Date: 1/1/0001
Description: ARPA-SLFRF FY26 Gerlach Gateway Park

Feasibility study for the Gerlach Gateway Park located on Parcel APN 071-240-12. Analyze the feasibility of developing approximately 1-2 acres of the parcel near SR447 to accommodate a gateway park which include a ±20 space parking lot, general location of future interpretive signage and art installation, other amenities as directed by Washoe County, and future space for a trailhead and trail connectivity. The feasibility study will include two (2) planning level alternative layouts and a colored illustrative preliminary site plan for the preferred alternative. As part of the feasibility study utilize County provided GIS data for topographic mapping, parcel lines, aerial, flood and drainage information, and will include desktop reviews for potential geotechnical, cultural, and environmental constraints. Wood Rodgers will also provide planning level cost estimates for final design and construction.

Fiscal Contact: Liz Phillips
If there are no attachments shown below, please contact the contract owner directly for more contract information.
Attachments / Files
  
Contract Management Software
Powered By: CobbleStone Systems Corp. - All Rights Reserved
Privacy Statement